BUILDING SPECS

Total SF

280,982 SF

Land

53.4 acres

Year Built

1963-1979, 2008 complete renovation of shell core of North Buildings. Full repaving, core & shell, entryways and landscaping improvements to the South Building completed in 2020

Floors

1-3 (varies throughout)

Construction

Steel frame on concrete slab

Roof

EDPM rubber membrane, new roof installed in 2020

Loading

2 loading docs serve South Building; Pocket lifts serve both South/North building

Access

Opportunities to provide separate entrances for tenants

HVAC

All available suites to be served by gas fired roof top units (RTU’s)

Electrical
Capacity

South building: served by 13,000 volt main feed; 277/480 volt power available throughout

Elevators

North: 2 passenger elevators; South: 2 passenger elevators

Fire Protection

Fully alarmed and sprinklered

Utilities

Electric/Gas: Rhode Island Energy

Sewer

Narragansett Bay Commission

Water

Lincoln water district

BUILDING SPECS

Total SF

280,982 SF

Land

53.4 acres

Year Built

1963-1979, 2008 complete renovation of shell core of North Buildings. Full repaving, core & shell, entryways and landscaping improvements to the South Building completed in 2020

Floors

1-3 (varies throughout)

Construction

Steel frame on concrete slab

Roof

EDPM rubber membrane, new roof installed in 2020

Loading

2 loading docs serve South Building; Pocket lifts serve both South/North building

Access

Opportunities to provide separate entrances for tenants

HVAC

All available suites to be served by gas fired roof top units (RTU’s)

Electrical Capacity

South building: served by 13,000 volt main feed; 277/480 volt power available throughout

Elevators

North: 2 passenger elevators; South: 2 passenger elevators

Fire Protection

Fully alarmed and sprinklered

Utilities

Electric/Gas: Rhode Island Energy

Sewer

Narragansett Bay Commission

Water

Lincoln water district

BUILDING SPECS

Total SF

280,982 SF

Land

53.4 acres

Year Built

1963-1979, 2008 complete renovation of shell core of North Buildings. Full repaving, core & shell, entryways and landscaping improvements to the South Building completed in 2020

Floors

1-3 (varies throughout)

Construction

Steel frame on concrete slab

Roof

EDPM rubber membrane, new roof installed in 2020

Loading

2 loading docs serve South Building; Pocket lifts serve both South/North building

Access

Opportunities to provide separate entrances for tenants

HVAC

All available suites to be served by gas fired roof top units (RTU’s)

Electrical Capacity

South building: served by 13,000 volt main feed; 277/480 volt power available throughout

Elevators

North: 2 passenger elevators; South: 2 passenger elevators

Fire Protection

Fully alarmed and sprinklered

Utilities

Electric/Gas: Rhode Island Energy

Sewer

Narragansett Bay Commission

Water

Lincoln water district