Total SF
280,982 SF
Land
53.4 acres
Year Built
1963-1979, 2008 complete renovation of shell core of North Buildings. Full repaving, core & shell, entryways and landscaping improvements to the South Building completed in 2020
Floors
1-3 (varies throughout)
Construction
Steel frame on concrete slab
Roof
EDPM rubber membrane, new roof installed in 2020
Loading
2 loading docs serve South Building; Pocket lifts serve both South/North building
Access
Opportunities to provide separate entrances for tenants
HVAC
All available suites to be served by gas fired roof top units (RTU’s)
Electrical
Capacity
South building: served by 13,000 volt main feed; 277/480 volt power available throughout
Elevators
North: 2 passenger elevators; South: 2 passenger elevators
Fire Protection
Fully alarmed and sprinklered
Utilities
Electric/Gas: Rhode Island Energy
Sewer
Narragansett Bay Commission
Water
Lincoln water district
BUILDING SPECS
Total SF
280,982 SF
Land
53.4 acres
Year Built
1963-1979, 2008 complete renovation of shell core of North Buildings. Full repaving, core & shell, entryways and landscaping improvements to the South Building completed in 2020
Floors
1-3 (varies throughout)
Construction
Steel frame on concrete slab
Roof
EDPM rubber membrane, new roof installed in 2020
Loading
2 loading docs serve South Building; Pocket lifts serve both South/North building
Access
Opportunities to provide separate entrances for tenants
HVAC
All available suites to be served by gas fired roof top units (RTU’s)
Electrical Capacity
South building: served by 13,000 volt main feed; 277/480 volt power available throughout
Elevators
North: 2 passenger elevators; South: 2 passenger elevators
Fire Protection
Fully alarmed and sprinklered
Utilities
Electric/Gas: Rhode Island Energy
Sewer
Narragansett Bay Commission
Water
Lincoln water district
BUILDING SPECS
Total SF
280,982 SF
Land
53.4 acres
Year Built
1963-1979, 2008 complete renovation of shell core of North Buildings. Full repaving, core & shell, entryways and landscaping improvements to the South Building completed in 2020
Floors
1-3 (varies throughout)
Construction
Steel frame on concrete slab
Roof
EDPM rubber membrane, new roof installed in 2020
Loading
2 loading docs serve South Building; Pocket lifts serve both South/North building
Access
Opportunities to provide separate entrances for tenants
HVAC
All available suites to be served by gas fired roof top units (RTU’s)
Electrical Capacity
South building: served by 13,000 volt main feed; 277/480 volt power available throughout
Elevators
North: 2 passenger elevators; South: 2 passenger elevators
Fire Protection
Fully alarmed and sprinklered
Utilities
Electric/Gas: Rhode Island Energy
Sewer
Narragansett Bay Commission
Water
Lincoln water district